
CP 399
Acrylic primer MIX IT 2K HS 4:1
MixIT is a high-filling primer with a very good level of coverage and anti-corrosive
properties. Due to its creamy consistency, it leaves a very smooth surface, can be easily
sanded and offers an efficient performance. MixIT is suitable for multi-type repairs and
can be wet-on-wet applied.
This primer is unique in its ability to produce various shades of grey, allowing the primed
background to be perfectly matched to the colour of a basecoat or direct gloss. Individual
shades are available as part of the recipe software, under the “Mixing products” tab.
The product is available in 1 and 3.5-Litre tins.
Available colors:
- Product benefits: Easy to process Very high-filling Smooth surface Good corrosion protection
- Spill: 1.00l / 3.50l
Specification
Industry use
WET-ON-WET APPLICATION
VERY HIGH-FILLING
SMOOTH SURFACE
EASY TO PROCESS
CORROSION PROTECTION
One coat followed by basecoat or
direct gloss application taking note of
evaporation time between layers
22-35 sek. DIN Cup 4mm
190 μm
~7-8 m2/L
1.5 hrs
1 coat 60-80 μm
2 coats 120-140 μm
3 coats 160-200 μm
P800-P1000
P320-P500
CP 399: 24 months in originally
sealed packaging
CP 282/ CP 285/ CP 286:
12 months in originally sealed
packaging
2004/42/WE IIB(c) (540) 500
Application
Abrade substrate using a red P300-400 abrasive pad by hand or P320 sanding disc using orbital sander. Remove dust particles before cleaning substrate with CP 015. After the substrate is clean and dry apply CP 399 with the required number of layers, taking note of the recommended evaporation time between coats. CP 399 can also be used as W-O-W primer and in this instance only one layer is required but thinning ratio must be increased to 30% CP 040. Bake or airdry before progressing to the next step of the process
4:1 100 parts of CP 399 25 parts of hardener CP 282/ CP 285/ CP 286 10 % of thinner CP 040/ CP 070/ CP 055/ CP 075 20-30 % of thinner CP 040/ CP 070/ CP 055/ CP 075 acc. to wet-on-wet method
Nozzle opening for pneumatic method: 1.6-1.8 mm wet-on-wet method: nozzle 1.2-1.4 mm, Operating pressure: HVLP/RP 2 bars
2-3 full coats
5 min after coating first and second coat at 20°C and 65% relative humidity. Evaporation continues until a matt surface is visible
Drying times at 20°C and 65% relative humidity: - dust dryness: 10 min - before sanding: 3.5-4 hrs Drying times at 40°C and 65% relative humidity: - before sanding: 1 hrs Drying times at 60°C and 65% relative humidity: - before sanding 30 min
before sanding ~30 min