CP 2008

CP 2008

Clearcoat 2K HS 2:1

CP 2008, two-component clearcoat, boasts a distinctive profile with low organic content (<420 g/l) and an exceptionally high solid content. This unique formulation results in a coating that showcases a captivating blend of high gloss, intensity, and formidable resistance against scratching and weathering. What sets CP 2008 apart is its capacity to form a substantial film, making it adaptable for both small and large-area applications. Elevating its performance, this clearcoat not only imparts an extra layer of gloss but also ensures extreme scratch resistance and remarkable UV protection, contributing to enduring durability and aesthetic excellence.

  • Product benefits: Scratch resistant Weather resistant High gloss finish Increases colour intensity Multiple options of reducing
  • Spill: 1.00l / 5.00l

Specification

Industry use

Agricultural and construction machinery
SCRATCHRESISTANT
Forklift trucks and hoists
INCREASES COLOUR INTENSITY
Commercial vehicles and machinery
WEATHER RESISTANT
Buses and truck tractors
HIGH GLOSS FINISH
Technical machinery and equipment
MULTIPLE OPTIONS OF REDUCING
SPRAY VISCOSITY
18-22 sec. DIN Flow Cup 4 mm
RECOMMENDED SIZES FOR PAINT STRAINER
125-190 μm
PAINT EFFICIENCY
7 m2/l
POT LIFE
1 hrs
DRY FILM THICKNESS
1 coat -25-30 μm
Abrade with P1500-P2500 range. The polishing can then be carried out with the Profix polishing system
MINIMUM SHELF LIFE
CP 2008: 24 months in originally sealed packaging CP 208: 12 months in originally sealed packaging
VOC
004/42/WE/IIB(e)(840)<840

Application

SUBSTRATE PREPARATION
Ensure basecoat surface is clean
using antistatic cloth before
applying clearcoat for a flawless
finish
MIXING RATIO
2:1
100 parts of CP 2008
50 parts of CP 208
add 2.5-10% of thinner CP 040/ CP 070/
CP 055/ CP 075
Alternative hardeners:
CP 208 Fast < 15°C
CP 208 Slow >25°C
SPRAY GUN SETTINGS
Nozzle size: 1.2-1.4 mm;
Operating pressure: HVLP/RP 1.8-2.0 bar
APPLICATION
1.5-2 coats
EVAPORATION TIME AFTER APPLICATION
5-10 min after coating at 20°C
and 65% relative humidity
DRYING
Drying times at 20°C and
65% relative humidity:
- dust dryness: 30 min
- non-tacking: 90 min
- for assembly: 7 hrs
- thoroughly: 10 hrs
Drying times at 60°C and
65% relative humidity:
- for assembly: 30 min
IR DRYING
~30 min

Related products

CP 208 FAST - Hardener

  • Spill: 1.00l

CP 208 SLOW - Hardener HS Slow

  • Spill: 1.00l

CP 208 - Hardener

  • Spill: 1.00l

CP 075 - 2K very slow thinner

  • Spill: 1.00l

CP 070 - 2K slow thinner

  • Spill: 1.00l

CP 055 - Multi-purpose thinner

  • Spill: 1.00l / 5.00l

CP 040 - Thinner 2K

  • Spill: 0.50l / 1.00l / 5.00l

Sign up for our newsletter

Get a head start with access to unique information about our latest paint products.

Products added for comparison: 1 PRODUCTS.COMPARE Clean