CP 2015

CP 2015

Quick-drying clearcoat 2K HS 2:1 X-Speed

CP 2015 clearcoat, based on high-quality HS resin, stands out for its notable advantage: rapid drying times of 5 minutes at 60°C, 15 minutes at 40°C, and less than 60 minutes at 20°C. The exceptionally high solids content (High Solid) ensures the creation of a highgloss and intense coating, making it ideal for both small and large-scale applications, particularly well-suited for smart repair work. An additional benefit lies in its extended open time, allowing the painting of multiple parts simultaneously without generating overspray. CP 2015 is further distinguished by its high scratch resistance, ensuring lasting durability.

  • Product benefits: Scratch resistant High gloss finish Bardzo krótki czas schnięcia Perfect for smart repair 1,5 coats can be applied
  • Spill: 1.00 l

Specification

Industry use

Agricultural and construction machinery
SCRATCHRESISTANT
Forklift trucks and hoists
SHORT DRYING TIME
Commercial vehicles and machinery
PERFECT FOR SMART REPAIR
Buses and truck tractors
HIGH GLOSS FINISH
Technical machinery and equipment
1,5 COATS CAN BE APPLIED
SPRAY VISCOSITY
16-20 sec. DIN Flow Cup 4 mm
RECOMMENDED SIZES FOR PAINT STRAINER
125-190 μm
PAINT EFFICIENCY
8-10 m2/l
POT LIFE
~30 min
DRY FILM THICKNESS
1 coat ~30 μm
Abrade with P1500-P2500 range. The polishing can then be carried out with the Profix polishing system
MINIMUM SHELF LIFE
CP 2015: 24 months in originally sealed packaging CP 3015: 12 months in originally sealed packaging
VOC
2004/42/WE IIB(d) (420) 420

Application

SUBSTRATE PREPARATION
Ensure basecoat surface is clean
using antistatic cloth before
applying clearcoat for a flawless
finish
MIXING RATIO
2:1
100 parts of CP 2015
50 parts of CP 3015
(thinner not to be added)
SPRAY GUN SETTINGS
Nozzle size: 1.2-1.4 mm;
Operating pressure: HVLP/RP 1.8-2.0 bar
APPLICATION
1.5-2 coats
EVAPORATION TIME AFTER APPLICATION
5-10 min after coating at 20°C
and 65% relative humidity
DRYING
Drying times at 20°C and
65% relative humidity:
- dust dryness: 15 min
- non-tacking: 25 min
- thoroughly: 1 hrs
Drying times at 40°C and
65% relative humidity:
- for assembly: 15 min
Drying times at 60°C and
65% relative humidity:
- for assembly: 5 min
IR DRYING
~5 min

Related products

CP 3015 - Hardener HS

  • Spill: 0.50 l

Sign up for our newsletter

Get a head start with access to unique information about our latest paint products.

Products added for comparison: 1 PRODUCTS.COMPARE Clean